For Honor - Marching Fire : Hallowed Bastion - Phase 2 Archer Point Building, Jessyca Lemire Bertrand : I modeled the stone base, the walls/arches, the ceiling structure, the pillars, the floor, the roof, the railings, the barricades and the fireplace. I